Need opinion of what to do?
1. Did a proposal with an architect/builder to do my house. Dec. 2005.
2. March 2006, gave him check for $5th.
3. As of this date, he has made 2 trips to my property and has done
nothing.
4. He told me, Pipe works was coming to demolish in a week or so.
Nothing happened.
5. He said, he was coming to do measurements for plan. DID NOT
happen.
6. He said he was coming to do elevations. DID NOT HAPPEN>
7. So, to date, He has DONE ZERO>
8. He keeps telling me, he's busy and swamped. I understand this
and have been very patient with him.
9. Keeps saying, he's getting a schematic design to me, as of today,
I don't even have this.
10. So, I have done the demolishing, basic plumbing and so on.
11. So, for my $5th , I have received ZERO. It has been over a year.
12. He is holding me up as far as starting to build. So, I have gotten
another contractor and builder.
I have asked him for my $5th returned, less $300 which he came to the
site about 2 or 3 times at $100 a visit. I think this is somewhat fair.
Of course, with a shematic design, this does me no good at all. I need
stamped plans and son on.....
He is a reputable person and firm in NO. I hate this problem. And
now, I'm not sure what avenue to take. He said, he had expenses
with my project, I don't know what expenses, as I have had nothing
from him, because he states that he has been too busy.
So.. any opinions as to what to do.
I'd appreciate it.
Thanks.
in the meantime, i have done some preliminary ground work and
so on.
1. I got tem. entergy pole,
2. plumbing for sewer clean out, etc